Energy saving products at wholesale prices for Michigan weatherization and utility programs.

 

Search


Other Pages

· Mercury Information
· Publications
· Energy Saving Tips
· Michigan Green Fund
· Michigan Incentives

RSS News Feeds

Michigan GREEN News in RSS 2.0 format
Michigan GREEN News

Michigan GREEN Top Stories in RSS 2.0 format
Michigan GREEN Top Stories

Old Articles
Monday, March 01, 2010
· NC GreenPower Model Translates to Smart Initiatives
Friday, February 26, 2010
· Regionalizing Smart Energy
Wednesday, February 24, 2010
· Green Era
Monday, February 22, 2010
· Nuclear Energy's Chances
Friday, February 19, 2010
· The Promise of Shale Gas
Thursday, February 18, 2010
· Letters from Readers - February 18, 2010
Wednesday, February 17, 2010
· Disclosing Carbon Risks
· Energizing Defense Contractors
Monday, February 15, 2010
· FutureGen's Restoration
Friday, February 12, 2010
· Profiting from Smart Grid

Older Articles
Add free business listings for energy, solar, wind power companies. Energy Business Green directory.

Michigan Malls is your Michigan Business Directory. Add your Michigan business for free.
Transmission Strains  
Energy News

February 08, 2010

The strains to our transmission system have been evident for some time.

"The U.S. transmission system is under tremendous strain and only marginally stable," Wayne Brunetti, the former chief executive officer of Xcel Energy, observed in 2002. "It was designed as a regional system and has been forced to function as a national system, a function for which it was not designed and does not handle very well."

And he made that statement before some tree branches on power lines in Ohio caused a blackout across most of the northeastern United States and parts of Canada in 2003. He also made the statement before someone threw the wrong switch in southern Florida and blacked out much of that state in 2008, with disturbances in the grid felt and observed across most of the eastern United States. Florida Power & Light Co. recently was assessed a $25 million fine for that event.

Brunetti made his statement before things like smart grid, renewable energy portfolio standards, carbon cap-and-trade, and a host of other issues reached the level of hype and legitimate concern they have reached today. He also made it before it became widely recognized that many of the required renewable energy systems, such as large-scale wind and solar farms, likely will be built in remote areas, with new transmission systems required to bring the power from where it is generated to where it is needed.

One problem Brunetti also mentioned back in 2002 is that it is increasingly difficult to site and build new transmission lines in many parts of the country because of environmentalists and more general not-in-my-backyard opposition. That hasn't changed and, as a result, Brunetti's original statement about the grid being over-stressed and marginally stable is as true today as it was then -- perhaps more so.

The Energy Information Administration lists concerns about the nationwide bulk power grid. The EIA says the four significant challenges to improving the power grid infrastructure are:

  • Siting new transmission lines (and obtaining approval of the new route and needed land) when there is local opposition to construction;
  • Determining an equitable approach for recovering the construction costs of a transmission line being built within one state when the new line provides economic and system operation benefits to out-of-state customers;
  • Ensuring that the network of long-distance transmission lines reaches renewable sites where high-quality renewable resources are located, which are often distant from areas where demand for electricity is concentrated, and
  • Addressing the uncertainty in federal regulatory procedures regarding who is responsible for paying for new transmission lines; this uncertainty affects the private sector's ability to raise money to build them.

The EIA also stated, "Most of the electrical transmission components have been in existence for many years. It is generally agreed that some replacement and upgrading of current lines will have to be done, and that new lines need to be constructed to maintain the system's overall reliability."

Reliability Issues

The fact that the transmission system already is aged -- much of it was constructed 50 years ago, with components expected to last 50 years -- also is a major reliability concern, as noted by the EIA. Fortunately, this situation is not nationwide, but there are parts of the country where a lack of bulk transmission is becoming critical. These include the Northeast in the megalopolis from Boston to Washington, and in southern California, where there are shortages of lots of things, including electric transmission.

To overcome these regional problems, in 2005 Congress authorized the Federal Energy Regulatory Commission to designate certain critical corridors for construction of major transmission lines. FERC did so, but again lawsuits, primarily filed by environmental organizations, have held up construction in those corridors. A federal court also stripped FERC of some of this authority. Two corridors FERC has approved are:

  • The Mid-Atlantic Area National Corridor, which includes some or all counties in Delaware, Ohio, Maryland, New Jersey, New York, Pennsylvania, Virginia, West Virginia, and Washington, and
  • The Southwest Area National Corridor, comprised of seven counties in southern California and three counties in western Arizona.

Some new transmission has been built in Texas over the last several years, primarily accessing wind farms in outlying areas. However, that success is relatively unique across much of the country.

The DOE also has provided incentives to encourage utilities to invest in transmission. These incentives include higher returns on equity and some cost recovery programs.

According to P. Kumar Agarwal, FERC acting director of the division of reliability and engineering services, a transmission project is assumed to qualify for incentives if it is approved through a regional planning process, is in a National Interest Electric Transmission Corridor and is approved by a state siting authority. Agarwal said thus far 27 projects totaling about 6,000 miles of transmission have been approved. They range from 230- to 765-kilovolt lines.

Assuming those 6,000 miles are built in California, Oklahoma, Kansas, North Carolina and the Northeast -- TransAllegheny -- they certainly will help. Some like the TransAllegheny and North Carolina lines, however, are under intensive attack.

Just as Wayne Brunetti cautioned almost a decade ago, the problem of reliability is alive and well today.

More information is available from Energy Central:


Warren Causey
Sierra Energy Group Guest Editor
Read Warren's Blog
Respond to the editor

Posted on Monday, February 08, 2010 @ 09:06:26 EST by webmaster
Sorry, Comments are not available for this article.
 
Related Links
· More about Energy News
· News by webmaster


Most read story about Energy News:
Heating Costs Seen Jumping This Winter

Article Rating
Average Score: 2
Votes: 1


Please take a second and vote for this article:

Excellent
Very Good
Good
Regular
Bad

Options

 Printer Friendly Printer Friendly

 

 Partners GREEN / Michigan GREEN

1215 Ludington Avenue
Escanaba, MI 49829
Ph: 888.473.5444
Fax: 866.430.8361

7627 Park Place
Brighton, MI 48116
Ph: 888.473.5444
Fax: 866.430.8361

 

Partners GREEN / Michigan GREEN © 2007